CONTRACT AWARD DISCLOSUREREPORT
Name of Project: InfrastructureServices Project (Malawi)
ProjectID: Grant H242-MAI
Contract description: aselineassessment, design and business planning for water supply and
sanitation at Bolero/Mwazisi and Nthalire
Scope of contract: The works will involve design andconstruction supervision of rehabilitation,
upgrading and construction of intake works,treatment plants, transmission mains, storage tanks,
distribution pipelines, auxiliary buildings, andextension of distribution system to newly
developed areas.
The Consultants are also expected to carry out baselineassessment, financial and tariff analysis,
immediate service improvement, prepare businessplans, prepare performance-based contracts
for utility operators and implement capacitybuilding programme for water user associations and
utility operators.
| Disclosure Report for Contract Awarded by QCBS |
| Name & address of consultant/firm | Technical score | Financial score | Final evaluated price (US$) | Final Ranking |
| Interconsult in association with GK Works c/oArea 3, Plot 443 Private Bag 255 Lilongwe 3 MALAWI | 81.4% | 100% | 269,057.67 | 1 |
| NJS Consultants 3rd Floor, Usagiya Building 1-10-10, Ueno, Taito-ku Tokyo 110-0005 Japan | 67.4% | N/A* | N/A* | N/A* |
Winning Consultant: Interconsult in association with GK Works
Contract Price: US$ 279,886.25 (US$ 180,326.25 lump-sum contractand
US$ 99,560.00 time-based) inclusiveof taxes
Duration: 34 months (7 months design, 3 monthstendering, 12 months construction supervision
and 12 months defect liabilityperiod)
Contract signature date: 3rdJuly 2008
*The firm did not qualify to have itsfinancial proposal opened and evaluated